Contribution chain

Last updated: 11/10/2026

The contribution chain is enabled per organization, with a configurable default workflow.

The contribution chain is the review workflow for the bid specification by the areas that must contribute before approving it. The typical route is Health & Safety, Labor and Contracts, with an optional final approver.

How it works

  1. With the bid specification in draft, send it to the chain. It moves to Under review.

  2. Each link receives the document, adds its requirements (for example, H&S adds safety and induction requirements; Labor, personnel conditions; Contracts, administrative requirements) and passes it to the next.

  3. Progress is shown in the bid specification's stepper: which stage it's in and what's left.

  4. Once the chain is complete (and the final approval if configured), the bid specification becomes Approved.

Notes

  • The order and the participants in the workflow are defined by your organization; it can be adjusted per bid specification when sending it.

  • Each area's contributions are integrated into the document and traced in the history.

  • An approved bid specification that is edited again must go through the workflow once more if your process requires it.

  • Complete and Return always in view: in the area's link, the Mark as completed and send and Return the spec buttons stay fixed at the bottom of the screen. When returning, the dialog says who the specification goes back to.

  • Locked concepts: in each area's tables, the Concepto column and the header are the company's standard text and cannot be edited: the cursor doesn't go in and rows can't be deleted. You still mark the X under SI/NO and write freely under "Otros / aclaraciones". It applies to specifications sent to the chain from now on.

  • Labor relations: the first row is "Requiere acta de adhesión a algún gremio" (union adhesion certificate required); the unions below indicate which one.

  • If your organization has a risk matrix set up, the matrix is filled in when a service bid specification is submitted. If the chain includes Health and Safety, Safety reviews it first, and Contracts validates it at the end with the last word. See Risk matrix.